Commercial Generator PM & NFPA 110 Load-Bank Checklist

Commercial & Residential Generator PM & NFPA 110 Load-Bank Checklist

Whether your facility operates a 1,500 kW Caterpillar diesel plant, a 150 kW Kohler natural gas commercial unit, or a 24 kW Generac residential standby generator, reliability during a utility blackout depends on disciplined, documented preventative maintenance. Below is NYREERโ€™s standard field inspection protocol.

1. Engine Lubrication, Fuel & Cooling Systems

  • Engine oil level, viscosity, and scheduled OEM oil & filter change
  • Laboratory lube-oil spectrographic analysis (commercial diesel units)
  • Fuel filter / water separator drainage and element replacement
  • Diesel fuel tank water-bottom check, biocide treatment & fuel polishing assessment
  • Natural gas / LP regulator static and running manometer pressure verification
  • Radiator coolant freeze-point protection (-35ยฐF+), pH/nitrite test & core debris cleaning
  • Jacket water block heater operation and thermostat temperature verification
  • Drive belts, radiator hoses, and vibration isolator inspection

2. Starting, Charging & Control Electronics

  • Starting battery specific gravity, open-circuit voltage & digital conductance load test
  • Battery terminal cleaning, anti-corrosion treatment & float-charger output calibration
  • Starter motor current draw and cranking RPM verification
  • Oil pressure, high coolant temperature, and overspeed safety shutdown tests
  • Controller fault history download and firmware/exercise clock verification

3. Alternator, Automatic Transfer Switch (ATS) & Load Bank

  • AC output voltage (L-L and L-N) and 60.0 Hz frequency stability under no-load and load
  • Total Harmonic Distortion (THD) check for compatibility with on-site solar/BESS inverters
  • Infrared thermal scan of generator main breaker and ATS normal/emergency lugs
  • Supervised live Automatic Transfer Switch (ATS) utility-dropout simulation and re-transfer timing
  • Annual NFPA 110 Stepped Resistive Load-Bank Test (2 hours at 30%โ€“80%+ rated kW to burn off wet-stacking carbon deposits and prove full thermal capacity)