This summary outlines the standard response times, preventative maintenance cadences, and escalation procedures for clients enrolled in an active NYREER Total Power Assurance Plan or Commercial Generator / EV O&M Contract.

Target Response & Escalation Standards

  • Severity 1 โ€” Emergency Power Loss (Standby generator fails to start/transfer during outage, or safety hazard / arc fault on switchgear, BESS, or solar array):
    • Remote Engineering Triage: Within 30 minutes (24/7/365 via (518) 633-1300)
    • On-Site Dispatch Target (Mission-Critical SLA): Within 4 hours across primary NY, NJ, VT & MA service corridors
  • Severity 2 โ€” Degraded Capacity / EV Plaza Offline (Primary inverter offline, BESS fault alarm, or multi-port commercial EV charging plaza down):
    • Remote Engineering Triage: Within 2 business hours
    • On-Site Dispatch Target: Within 12 โ€“ 24 hours
  • Severity 3 โ€” Single String / Port or Routine Service (Single EV connector fault, minor monitoring telemetry drop, or scheduled PM adjustment):
    • Remote Engineering Triage: Within 1 business day
    • On-Site Dispatch Target: Scheduled within 3 โ€“ 5 business days

Enrolling Your Facility

To request a custom site-specific SLA contract covering your solar arrays, BESS, Kohler/Generac/Cat generators, and EV charging stations, visit our Total Power Assurance Plans page or complete the Generator PM & Assurance Enrollment Form.