Skip to main content
Field-Proven Project Case Study

86.4 kW DC Commercial Solar Tracker System

High-yield 86.4 kW DC dual-axis commercial tracking installation engineered to follow the sun from east to west, broadening the solar production curve across morning and late-afternoon utility peak demand windows.

Project Highlights

  • System Capacity: 86.4 kW DC dual-axis tracking array
  • Yield Advantage: Generates up to 35%โ€“45% more annual kWh per module compared to fixed-tilt racking while shedding snow automatically
  • Structural Engineering: Deep-foundation concrete piers engineered for high wind-stow survivability

Ready to Engineer Resilient Power or High-Throughput EV Charging?

Speak directly with NYREERโ€™s senior electrical engineers and master technicians serving NY, NJ, VT, and MA.